He looked at the Pro2Go strips left in his pouch. Each one represented ten seconds saved. Ten frustrations avoided. Ten chances to look up from the dirt and see the building, not the bolt.
Down at the office later, the bean counters ran the numbers. They had saved $40 on fasteners. But Mike’s crew had finished the framing phase in four hours, not seven. That was $3,000 in labor saved. No re-dos. No waste. pro2go fasteners
“Comparable,” Mike grumbled, turning a cheap bolt over in his gloved hand. It had a dull, uneven coating. “Comparable to a chocolate teapot.” He looked at the Pro2Go strips left in his pouch
Mike nodded.
The memo went out that afternoon: All sites switch to Pro2Go effective immediately. not seven. That was $3